North Bay Truck Center called me out to remove the fuel tank sending unit from a damaged tank, to a Doner tank that does not have a sending unit.
After roughly cutting out the existing Bung, and laying out the placement the position onto the doner tank, I removed the Bung from the excess material and welded it to the doner tank.
- Commercial Work, Classic restorations, Custom Exhaust, Frames, Structural welding
- Small to large scale piping jobs that operate under high pressure and temperature service, sanitary welding
- Platform construction and repairs including redesigning and or replacement
- Custom fabrication of guards, handrails, safety covers, and shields to comply with OSHA and Cal OSHA regulations.
- Overlay and weld build-up using Stellite and other hard facing Alloys.